Dan removed an existing Jacuzzi tub, tiled shower enclosure, carpet and carpet pad. He re-terminated the electrical supply, and relocated plumbing to accommodate a walk-in shower. He installed a shower pan, water resistant drywall, tile backing, mixing valve and shower head. He installed ceramic tile in the enclosure and on the bathroom floor and grab bars in the shower enclosure. He then installed a new toilet. He completed the job by priming and painting the entire bathroom.
Member Comments:
Dan was very prompt in responding to my request for an estimate. He gave us ideas to consider regarding tile patterns and fixtures, and suggestions for modifications to accommodate our needs. He was very considerate in protecting an adjoining bedroom and walk-in closet from construction dust and debris. I was especially pleased that Dan is accomplished in all the trades, and did not have to resort to using sub-contractors. He was careful to consult us when the inevitable minor modifications to the plan had to be made. He was very cooperative in adjusting his work schedule to our daily routine. Dan completed the job in a timely manner, and within budget. Overall, I was very pleased with Dan's performance, and would not hesitate to recommend him to others.